Two lanes of southbound Interstate 5 across the Ship Canal Bridge will be closed for roadway maintenance and pothole repair nightly, Sept. 21-24, from 11:30 p.m. to 5 a.m. The closure is scheduled to end on Sept. 25, 2026, at 5 a.m.
I-5 maintenance closes lanes nightly through Sept. 24
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- βI-5 maintenance closes lanes nightly through Sept. 24β005 [14 mi from Bremerton]: Two lanes of southbound Interstate 5 across the Ship Canal Bridge will be closed for roadway maintenance and pothole repair nightly, Sept. 21-24, from 11:30 p.m. to 5 a.m.β
- βWSDOT closes southbound I-5 lanes for pothole repair Sept. 21-24, 11:30 p.m. to 5 a.m.β005 [14 mi from Bremerton]: Two lanes of southbound Interstate 5 across the Ship Canal Bridge will be closed for roadway maintenance and pothole repair nightly, Sept. 21-24, from 11:30 p.m. to 5 a.m.β
- βTwo lanes of southbound Interstate 5 across the Ship Canal Bridge will be closed for roadway maintenance and pothole repair nightly, Sept. 21-24, from 11:30 p.m. to 5 a.m. The closure is scheduled to end on Sept. 25, 2026, at 5 a.m.β005 [14 mi from Bremerton]: Two lanes of southbound Interstate 5 across the Ship Canal Bridge will be closed for roadway maintenance and pothole repair nightly, Sept. 21-24, from 11:30 p.m. to 5 a.m. Effective: Sep 21, 2026, 3:00 PM Expected end: Sep 25, 2026, 5:00 AMβ
Source text saved for this check (2026-09-24T12:32:17.178Z)
WSDOT highway construction and road closures within 50 miles of Bremerton β 9/24/2026: 005 [14 mi from Bremerton]: Two lanes of southbound Interstate 5 across the Ship Canal Bridge will be closed for roadway maintenance and pothole repair nightly, Sept. 21-24, from 11:30 p.m. to 5 a.m. Effective: Sep 21, 2026, 3:00 PM Expected end: Sep 25, 2026, 5:00 AM 005 [15 mi from Bremerton]: From noon to 1:30 p.m. Thursday, Sept. 24, the right lane of the westbound South Columbian Way ramp from Interstate 5 (milepost 163) will close for maintenance. Effective: Sep 18, 2026, 12:17 PM Expected end: Sep 24, 2026, 1:30 PM 520 [16 mi from Bremerton]: Monday, Sept. 21, until the morning of Friday, Sept. 25 - The eastbound SR 520 off-ramp to Montlake Boulevard in Seattle will close for construction from 10 p.m. to 6 a.m. nightly Sept. 21-24. The ramp will reopen at 6 a.m. each of the following mornings. All traffic from I-5 that enters eastbound SR 520 during the hours this ramp is closed will cross Lake Washington and pay the SR 520 Bridge Toll. Those who do not want to pay the toll or need to access Montlake must use alternate routes. Effective: Sep 21, 2026, 12:16 PM Expected end: Sep 25, 2026, 6:00 AM 005 [17 mi from Bremerton]: The southbound Interstate 5 off-ramps to eastbound and westbound North Northgate Way and the westbound North Northgate Way on-ramp to I-5 will be closed nightly, beginning at 9 p.m. each night until 5 a.m. the following morning from Monday, Sept. 21, through Thursday, Sept. 24. Additionally, westbound North Northgate Way will be reduced to one lane near the on-ramp to southbound I-5. Effective: Sep 21, 2026, 3:05 PM Expected end: Sep 25, 2026, 5:00 AM 405 [19 mi from Bremerton]: The southbound I-405 off-ramp to northbound I-5 / Southcenter Boulevard will be closed nightly, 10 p.m. Wednesday, Sept. 23 β 4:30 a.m. Friday, Sept. 25. A signed detour will be in place. Effective: Sep 23, 2026, 12:00 AM Expected end: Sep 25, 2026, 4:30 AM 405 [19 mi from Bremerton]: Up to two lanes of northbound I-405 from I-5 (milepost 0) to SR 167 (milepost 2.5) will be closed nightly, 9 p.m. Wednesday, Sept. 23 β 5 a.m. Friday, Sept. 25. Effective: Sep 23, 2026, 12:00 AM Expected end: Sep 25, 2026, 5:00 AM 405 [19 mi from Bremerton]: The northbound I-5 on-ramp to northbound I-405 will be closed nightly, 9 p.m. Wednesday, Sept. 23 β 4:30 a.m. Friday, Sept. 25. A signed detour will be in place. Effective: Sep 23, 2026, 12:00 AM Expected end: Sep 25, 2026, 4:30 AM 405 [19 mi from Bremerton]: Up to two lanes of southbound I-405 from SR 181 (milepost 1) to I-5 (milepost 0.3) will be closed nightly, 9:30 p.m. Wednesday, Sept. 23 β 4:30 a.m. Friday, Sept. 25. Effective: Sep 23, 2026, 12:00 AM Expected end: Sep 25, 2026, 4:30 AM
The Bremerton Wire is free. Get Bremerton's news delivered every morning.