Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday, Aug. 28, to 4 a.m. Monday, Aug. 31, according to WSDOT. A signed detour will be in place during the closure. The closure is part of ongoing construction on I-405. WSDOT notes the detour will help guide drivers around the work zone. The closure affects the stretch between Northeast 85th Street and Northeast 100th Street.
I-405 Northbound Lanes Closed for Repairs
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 7 claims supported Β· 57%
Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- βUp to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Streetβ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.β
- βThe closure will occur from 11 p.m. Friday, Aug. 28, to 4 a.m. Monday, Aug. 31β405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.β
- β WSDOT announced the closureNo usable supporting receipt β unverified.
- βA signed detour will be in place during the closureβA signed detour will be in place.β
- β The closure is part of ongoing construction on I-405No usable supporting receipt β unverified.
- β WSDOT notes the detour will help guide drivers around the work zoneNo usable supporting receipt β unverified.
- βThe closure affects the stretch between Northeast 85th Street and Northeast 100th Streetβ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.β
The Bremerton Wire is free. Get Bremerton's news delivered every morning.